Skip to content
Call Us: 01234 5678910
Free UK Delivery on Orders Over £150
Apply for Trade Account
Call
Account
Cart
Brands
Arley
BC Designs
Grohe
Hudson Reed
Ideal Standard
Nuie
RAK Ceramics
Vitra
Showers
Enclosures
Quadrants
Offset Quadrants
Hinged Doors
Pivot Doors
Bi-Fold Doors
Single Sliding Doors
Double Sliding Doors
Wetroom Screens
Wetrooms
Shower Trays
Rectangular Trays
Square Trays
Quadrant Trays
Offset Quadrant Trays
Wetroom Trays
Shower Valves
1 Outlet Valves
2 Outlet Valves
3 Outlet Valves
Bar Shower Valves
Concealed Valve Sets
Exposed Valve Sets
Shower Kits & Heads
Bar Mixer Shower Sets
Fixed Heads
Hand Held Shower Kits
Rigid Riser Kits
Shower Slide Rail Kits
Shower Arms
Shower Accessories
Shower Parts
Enclosure Accessories
Shower Tray Wastes
Wetroom Accessories
Bathtubs
Bath Types
Single Ended Baths
Double Ended Baths
Freestanding Baths
Back to Wall Baths
Corner Baths
Whirlpool Baths
Shower Baths
P Shaped Shower Baths
B Shaped Shower Baths
Square Shower Baths
Bath Accessories
Bath Panels
Bath Screens
Bath Wastes & Extras
Leg Sets & Plinths
Toilets
Toilet Types
Close Coupled Toilets
Wall Hung Toilets
Back to Wall Toilets
Toilet Parts
Pan Only
Cistern Only
Toilet Seats
Concealed Cisterns & Frames
Toilet Accessories
WC Units
Toilet Accessories
Doc M Packs
Bidets
Bidets
Bidet Taps
Vanity Units
Wall Hung
Wall Hung Vanities
Floorstanding
Floorstanding Vanities
Cloakroom Vanities
Furniture Packs
Full Depth Furniture Packs
Compact Furniture Packs
Combination Furniture Packs
Counter Top Units
Counter Top Basin Units
Furniture Extras
Tall Units
Fitted Units
Wall Units
Furniture Worktops
Furniture Basins
Taps & Mixers
Basin Taps
Mono Basin Taps
Tall Basin Taps
Mini Basin Taps
Pillar Taps
Wall Mounted Basin Taps
Bath Taps
Bath Fillers
Bath Shower Mixers
Bath Pillar Taps
Kitchen Taps
Mono Taps
Mixer Taps
Pillar Taps
Tap Accessories
Tap Extras
Heating
Radiators
Single Panel Radiators
Double Panel Radiators
Traditional Column Radiators
Towel Rails
Heated Towel Rails
Electric Flat Panel Towel Rails
Electric Bar Towel Rails
Heating Accessories
Radiator Valves
Heating Extras
Accessories
Basins
Basins & Full Pedestals
Basins & Semi Pedestals
Wall Hung Basins
Vessels
Basin Only
Mirrors & Cabinets
Mirror Cabinets
LED Mirrors
Unlit Mirrors
Bathroom Suites
Bathroom Suites
Cloakroom Suites
Spare Parts
Spare Parts
Kitchen
Kitchen Sinks
Butler Sink
Belfast Sink
Undermount Sinks
Kitchen Taps
Mono Taps
Mixer Taps
Pillar Taps
Clearance
Bathtubs
Bath Panels & Accessories
WBS304
Skip to product information
Open media 1 in modal
Open media 2 in modal
1
/
of
2
Nuie 1800mm Acrylic Shower Bath Front Panel
Nuie 1800mm Acrylic Shower Bath Front Panel
Login for trade prices
VAT included.
Product variants
Default Title - £128.33
Quantity
(
0
in cart)
Decrease quantity for Nuie 1800mm Acrylic Shower Bath Front Panel
Increase quantity for Nuie 1800mm Acrylic Shower Bath Front Panel
9+ available
Login for trade prices
Share
Share
Link
Close share
Copy link
View full details
Product Description
Shower Bath Front Panel (1800mm)
Choosing a selection results in a full page refresh.
Opens in a new window.